Craigavon Senior High

The works included the upgrade of the heating system within the existing school, undertaken in a manner to allow the school to continue to function as normally as possible for the duration of the contract. Firstly we stripped out and removed the redundant plant and equipment, protecting the existing structures as works progressed. We then installed new gas, heating, plumbing, ventilation, lighting, power and soils and waste installations. The works were completed with associated building works, redecoration and testing and commissioning.

The works were programmed around the school’s activities and peak periods including pick-up and drop-off times, which prevented traffic nuisance and disturbance to the school.